Confirm layout and fixtures.
Building layout, fixture points, and water source or discharge requirements are confirmed before installation.
Plumbing Installation
Plumbing installation for commercial buildings and public facilities under subclassification IN007, covering pipe runs, connections, fixture points, and pre-handover testing.
Scope
Building layout, fixture points, and water source or discharge requirements are confirmed before installation.
Pipe runs and connection points are sequenced with other trades and site access windows.
Systems are tested for leaks and flow before closeout documentation is issued.
Share the building layout and fixture list so the first plan reflects the real site conditions.